With a nine-week programme of EV charging, solar PV, fencing and drainage works now complete at Cameron Court in Warrington, Workman reflects on the delivery of a project that demonstrates how targeted upgrades can support both operational and sustainability goals.

Net zero has transitioned from boardroom ambition to an everyday operational priority for many occupiers. Rising energy costs, the steady shift to electric vehicles and growing pressure to report on carbon all point the same way: buildings need to do more.

While the conversation often focuses on new developments, some of the most effective improvements can be achieved by upgrading existing assets. Cameron Court is a strong example of this approach.

Units 15, 16 and 21 at Cameron Court, on the established Winwick Quay Industrial Estate in Warrington are occupied by Christeyns Food Hygiene Ltd, a specialist provider of hygiene solutions for the food industry. The business required infrastructure improvements to enhance site security, improve operational efficiency and support its wider net zero objectives.

Workman was appointed by Christeyns as Project Manager and Contract Administrator on the delivery of EV, PV, fencing and drainage installations across the three units. The wider team consisted of TMT Commercial Contractors Ltd as the Contractor, FHP as the M&E Engineer and WML Consulting as the Civils Engineer, with Nuveen (Coal Pension Properties Ltd) as Landlord.

Delivered on a live industrial site, the project combines practical infrastructure improvements with renewable energy generation.

Built around the occupier

As Project Manager and Contract Administrator, Workman was the client’s primary point of contact throughout the project.

Our role included coordinating the design team, managing programme delivery, administering the building contract and overseeing the project from initial brief through to completion.

The project brief was developed around the operational requirements of the occupier. Christeyns required enhanced infrastructure and improved site security, alongside measures that would reduce energy consumption and future-proof the estate.

Delivering these improvements across three occupied units required careful planning and close coordination between the civils and electrical works packages to ensure business operations could continue with minimal disruption throughout the construction period.

Infrastructure that works harder

The scheme included significant drainage and external works upgrades, providing a robust foundation for the site’s future operation and improving the resilience of its infrastructure. New perimeter fencing and gates have strengthened site security, giving greater control over entry and better protection across the estate.

The project also delivered new electric vehicle charging infrastructure, supporting the continued transition to electric transport and providing convenient on-site charging facilities for occupiers and visitors.

Designed for a greener future

A key element of the project was the installation of photovoltaic (PV) solar systems and supporting electrical infrastructure across the units, including power for the EV chargers. These renewable energy solutions allow Christeyns to generate clean electricity on site, helping to reduce energy costs, lower carbon emissions and improve the environmental performance of the buildings.

Upgrading existing industrial units, rather than relocating or rebuilding, is one of the most sustainable choices an occupier and landlord can make. It makes better use of the buildings already in place while strengthening the long-term performance of the asset.

With the works now complete, Cameron Court offers a more efficient, secure and sustainable environment for Christeyns, and a future-ready asset for its landlord.

“This project is a great example of how operational resilience and sustainability can be delivered hand in hand for industrial occupiers. By combining on-site renewable generation with EV infrastructure and enhanced security, Christeyns now has a site that’s fit for the future – both operationally and environmentally.”

Keiran Melfi Partner

We help occupiers and owners improve how their buildings perform.

See how we can help
Keiran recommends reading...

Restoring a hidden gem: Workman’s role in the regeneration of Sicilian Avenue

Read More
→
Sign Up
Sign Up